Your browser does not support JavaScript! Infrastructure | Welcome to Uttar Pradesh Power Transmission Corporation Limited, Government of Uttar Pradesh, India.

Infrastructure

Sr. No. Subject View/Download
1. Transformers in Transmission Organisation (132 KV and Above)
Size : 269 KB | Lang : English
View/Download
2. Particulars of Primary Lines in service Size : 311 KB | Lang : English View/Download
3. Transformation capacity at Grid Sub-Station - 132 KV & above (Year Wise)
Size : 57 KB | Lang : English
View/Download
4. Status of 132KV & 33KV Capacitor Banks installed at 400KV, 220KV &
132KV S/S Size : 157 KB | Lang : English
View/Download
5. Daily Maximum and Minimum Demand Met (MW) Size : 417 KB | Lang : English View/Download
6. List of bay available for 500 MW bid of UPNEDA (Fourth Phase)  Size : 2.29 MB | Lang : English | Date: 26-09-2019
View/Download
7 Available 33 KV Bays to be connected by Discom Size : 397 KB | Lang : Hindi View/Download
DVVNL Size : 700 KB | Lang : Hindi View/Download
KESCO Size : 294 KB | Lang : Hindi View/Download
MVVNL Size : 752 KB | Lang : Hindi View/Download
PuVVNL Size : 1.20 MB | Lang : Hindi View/Download
PaVVNL Size : 1.8 MB | Lang : Hindi View/Download
8
Subject View/Download
2012-13 Size : 60 KB | Lang : Hindi View/Download
2013-14 Size : 61 KB | Lang : Hindi View/Download
2014-15 Size : 75 KB | Lang : Hindi View/Download
2015-16 Size : 64 KB | Lang : Hindi View/Download
2016-17 Size : 90 KB | Lang : Hindi View/Download
Subject View/Download
2017-18 Size : 213 KB | Lang : Hindi View/Download
2018-19 Size : 356 KB | Lang : Hindi View/Download
2019-20 Size : 257 KB | Lang : Hindi View/Download
2020-21 Size : 278 KB | Lang : Hindi View/Download
2021-22 Size : 466 KB | Lang : Hindi View/Download
Subject View/Download
2023-24 Size : 599 KB | Lang : Hindi View/Download
2022-23 Size : 599 KB | Lang : Hindi View/Download
9 Self Certificate of UFR & df/dt Quarter Ending September, 2024
Size : 11 MB | Lang : English | Date: 15-10-2024
View/Download