It is hereby certified that the electrical overhead line/underground cable crossing No............At Km.............on the section............of the..............Division of the............. Railway has been constructed in compliance with Indian Electricity Act 1910, and Indian Railways Act-1890, and the rules made there under and as amended from time to time and the Regulations for power line crossings of Railway Tracks, 1987. The crossing has also been constructed in accordance with the drawing approved by the............Railway and Electrical Inspector of the.............Railway, the references of which are given below :
SI. No. |
Drawing No |
Title of Drawing |
Location of crossing £ |
Reference under which drawing is approved |
Approving authority |
1.
|
|
|
|
|
|
2.
|
|
|
|
|
|
3.
|
|
|
|
|
|
2.* It is also hereby certified that the overhead line crossing specially released as per clause 22.4 of the 'Regulations for power Line Crossing of Railway Tracks, 1987' would be modified by the owner, on a approved design whenever Railway will require to modify such crossing due to introduction of electric traction on the section of the Railway.
Along with a reproducible print eight copies of the drawings showing the completed power line crossing is/are enclosed.
(Seal of the Owner)
Signature...........................
(Name of the owner)
Date..........................
Place .........................
* Strike off, if not applicable.
£ The location of the overhead line crossing or underground cable will be identified by indicating the kilometrage with the painted number of the traction masts/structures and/or telegraph posts, as available, between which the overhead line of underground cable crossing is located.