Stringing Charts For River Crossings

  • Final stringing charts are prepared on the basis of sag and tension calculations at different temperatures under no-wind condition for a particular proposal as per Annexure-1. These charts give final values of sag and tension which should never be exceeded on a line.
  • The stringing should be done as per initial stringing charts which are prepared after taking into account creep correction for the conductors. For earthwire no creep correction is required.
  • The stringing charts for river crossings are prepared from anchor tower to anchor tower only.
  • Sag indicated in the stringing charts are with respect to higher tower is determined as follows for cases where there is level difference between two towers.
    Sag at span = {2a / L}2 x Sag at particular temperature for crossing span.
    where,
    a = L / 2 + TH / WL
    where,
    L = Crossing span Cm)
    T = Tension at particular temperature under No-wind for equivalent span (kg)
    h = Difference of R.L. of towers, (m)
    W = Unit weight of conductor/Earth wire. (kg/meter)
  • For cases where there is no level difference, the value of sag given in the stringing chart for the corresponding crossing span may be adopted