Some of the functionalities will not work if javascript off. Please enable Javascript for it.
Home
Screen Reader Access
Skip to Main Content
Sitemap
A--
A
A++
T
T
हिंदी संस्करण
Login
Search
Toggle navigation
About Us
About UPPTCL
Objectives
Infrastructure
Organizational Structure
Total Transmission Lines
Total Substation
Approved Drawing
Board of Directors
Acts & Rules
Acts
Rules
Tenders
NIT
Commercial
Finance & Accounts
On Going Project
On Going Transmission Works
AMR SAMAST
TLPS Patrolling
Bill Tracking System (BTS)
BTS User Manual
UPPTCL Substation Snapshot
Online Services
CSR
CSR Policy
CSR Committee
CSR Projects
SLDC
Employee Corner
ERP
Substation Map
Dashboard PM Module
Zonal Master Sheet
Circulars
Documents/Reports
WPP
Contact Us
Reach Us
Corporate Directory
Feedback
Frequently Asked Questions
Stringing Charts For River Crossings
Home
|
Stringing Charts For River Crossings
Quick Links
Transmission MAPS
Right To Information
ARR & Tariff Order
PPP Transmission Projects
Miscellaneous
Gallery
Non Conventional Energy
UPPTCL Petition for ISTS Certified Lines
Final stringing charts are prepared on the basis of sag and tension calculations at different temperatures under no-wind condition for a particular proposal as per Annexure-1. These charts give final values of sag and tension which should never be exceeded on a line.
The stringing should be done as per initial stringing charts which are prepared after taking into account creep correction for the conductors. For earthwire no creep correction is required.
The stringing charts for river crossings are prepared from anchor tower to anchor tower only.
Sag indicated in the stringing charts are with respect to higher tower is determined as follows for cases where there is level difference between two towers.
Sag at span = {2a / L}2 x Sag at particular temperature for crossing span.
where,
a = L / 2 + TH / WL
where,
L = Crossing span Cm)
T = Tension at particular temperature under No-wind for equivalent span (kg)
h = Difference of R.L. of towers, (m)
W = Unit weight of conductor/Earth wire. (kg/meter)
For cases where there is no level difference, the value of sag given in the stringing chart for the corresponding crossing span may be adopted
Your browser does not support JavaScript!
Your browser does not support JavaScript!
Your browser does not support JavaScript!
Your browser does not support JavaScript!
Your browser does not support JavaScript!
Your browser does not support JavaScript!